Construction of the improvements to the Old Glenn Highway are scheduled to begin in April 2008.  The project will consist of multiple phases:

 

·         Summer 2008—Utility lines will be relocated between Fire Lake and South Birchwood Loop Road. A sewer force main between East Lake Ridge Drive and South Birchwood Loop Road will be installed by AWWU. 

·         2008/2009 Phase 1 Road Construction—Fire Lake to South Birchwood Loop Road

·         2010 (or later) Phase 2 Road Construction - South Birchwood Loop Road to Ski Road

 

 